SPECIAL REPORT: WA will be waiting until at least 2030 before an outer harbour development is needed, and in the meantime work is being done to evaluate the best ways to extend the life of Fremantle Port.
SPECIAL REPORT: Costs and a local skills shortage are among the challenges facing the state as it seeks to develop a local train car manufacturing sector.