The Shire of Collie has backed international power producer Neoen's proposal for a $675 million, 1,000-megawatt battery energy storage system on a 31.4-hectare piece of land in Palmer.
The Shire of Collie has backed international power producer Neoen's proposal for a $675 million, 1,000-megawatt battery energy storage system on a 31.4-hectare piece of land in Palmer.