A pre-feasibility study into Perth-based Strike Resources Ltd's Peru iron ore project has pegged total capital cost at $2.4 billion based on a 20 million tonne per annum operation.
A pre-feasibility study into Perth-based Strike Resources Ltd's Peru iron ore project has pegged total capital cost at $2.4 billion based on a 20 million tonne per annum operation.