Fleetwood has struck a deal with the contractor building Perdaman’s $6.4 billion urea plant on the Burrup Peninsula to house staff at its Karratha workforce camp.

Fleetwood has struck a deal with the contractor building Perdaman’s $6.4 billion urea plant on the Burrup Peninsula to house staff at its Karratha workforce camp.