Skip to main content
18/02/2021 - 09:19

Oar Resources uncovers high-value SA halloysite

18/02/2021 - 09:19

Bookmark

Save articles for future reference.

First-pass drilling at Oar Resources’ Gibraltar project in SA has delivered a potential treasure trove of mineralisation, with sampling revealing intercepts of both high-value halloysite and kaolinite. Some stand-out results for the flourishing project area include 3 metres at 19.6 per cent halloysite with 42.4 per cent kaolinite from 26m and an equally impressive 13m at 5.3 per cent halloysite with 80.9 per cent kaolinite.

X