Downer EDI has secured a $400 million contract with Bechtel for two electrical and instrumentation packages for the downstream portion of the Chevron-operated Wheatstone project.
Downer EDI has secured a $400 million contract with Bechtel for two electrical and instrumentation packages for the downstream portion of the Chevron-operated Wheatstone project.