Skip to main content

Kula/Aurumin JV reports 98,500t maiden gold resource in WA Goldfields

2 hours ago

Bookmark

Save articles for future reference.

Kula Gold/Aurumin Ltd have reported a 98,534-tonne maiden resource grading 0.63g/t gold for tailings at their joint venture Mt Palmer project in WA’s Goldfields, boosting the project's early monetisation potential. The inferred resource, defined by 60 air core drill holes, contains 1996 ounces of gold at a 0.4g/t cut-off, with preliminary metallurgical testwork showing an average 86 per cent gold recovery rate.

X