Skip to main content
27/04/2022 - 15:42

Aurumin fires up rig in search of WA lithium

27/04/2022 - 15:42

Bookmark

Save articles for future reference.

Aurumin Limited is going after lithium-bearing pegmatites with the drill bit at its Mt Palmer project in WA. The ongoing program will drill up to 2500m of RC holes and is expected to take about one week with assays to be fast tracked. The explorer firmed up its targets with a series of soil samples revealing anomalous geochemistry coinciding with historically intercepted pegmatites.

X