Kingwest Resources said its Pericles prospect has booked an 87% upgrade in total estimated resources to 79,500 ounces of contained gold which pushes the total near-surface resources at the Menzies Gold project to 208,300oz of gold. The indicated resource at Pericles now sits at 630,000 tonnes at 1.8g/t gold and the inferred resource is 780,000 tonnes grading 1.7g/t gold.
![](/themes/bn2020/images/squares.gif)